West Hill Subway - TFL

Following issues with the existing surface of the West Hill subway being too slippery and causing a hazard for pedestrians, TFL came to TJ Surfacing for a solution to the problem. TFL had a number of criteria that needed to be met, these included ensuring the subway could remain open at all times, even whilst the work was to be carried out. After examining the existing surface, we were able to confirm an anti-skid surface could be laid onto the existing surface without any preparation works, proving anti-skid surfacing to be a very cost effective solution.

The works were completed within one day during off peak hours and the subway was able to stay open to pedestrians at all times. We are able to do this by completing the works in two halves, which allowed pedestrians to still pass through whilst the works were being carried out. Applying the anti-skid surfacing has eliminated the skid resistance issues, which were particularly bad on the ramps of the subway. Pedestrians can now pass through the subway much more safely and not have to worry about slipping over on the previously worn out surface.

Need to talk?

Call us on 01622 832414

Open Monday to Friday 9am - 6pm Or why not email us?

Copyright © 2012 TJ Surfacing Ltd. Registered in England & Wales No. 07083262 - Find us on Google+

Registered Office: TJ Surfacing Ltd, Suite 100,
80 Churchill Square Business Centre, Kings Hill,
West Malling, Kent, ME19 4YU